River Deel Flood Relief Scheme

River Deel Flood Relief Scheme

Extensive Civil Engineering works associated with the excavation and construction of an extensive flood relief diversion channel including a reinforced concrete channel intake structure, river flow control structure, an energy dissipation structure, the construction of 2 No. new bridges (Mullenmore and Pollnacross) and the significant road and underground utility diversion works to Lake Road in 2 No. locations.

Client:
OPW
Location:
Crossmolina